| Availability: | |
|---|---|
| Quantity: | |
Technical Parameters
Brand name | steel structure workshop |
Model | 1.Single slope, Double slope, Multi-slope. |
2.Single span, Double-span, Multi-span, Single floor, Double floors. | |
Column and beam | 1.Q235B (A36/S235JR equivalent) & Q355B (A572 Grade 50/S355JR equivalent). |
2.All bolts connecting. | |
3.Straight cross-section or Variable cross-section. | |
Surface | Hot-dip galvanized or painted. |
Roof and wall panel | 1.EPS ,PU ,Rock wool sandwich panel. |
2.Single colorful corrugated steel sheet0.326~0.6mm thick, YX28-205-820(820mm wide). | |
3.Sandwich panel with EPS, ROCK WOOL, PU etc insulation thicknessaround 50mm~150mm, 950mm or 960mm width. | |
Brace | X or V as well as other type bracing made from angle, round pipe etc. |
Accessories | Semi-transparent skylight belts, Ventilators, down pipe, outer gutter etc. |
Window | PVC or Aluminum Alloy. |
C or Z purlin | Size from C120~C320, Z100~Z200. |
Door | Sliding or Rolling up door. |
Carrying capacity | 1.Resisting winds and seismic impacts. |
2.Bearing heavy snows. | |
Drawing | 1.Making the design and quotation according to your requirements very soon. |
2.Making the quotation according to your drawings. | |
3.Giving you the satisfying opinion to your projects | |
Certificate | ISO9001:2008,AWS certified welder passport,SGS,BV. |
Product Cases
QINGDAO HUINUOCHANGYUAN HEAVY INDUSTRY PROJECT
The project is located in Nancun Town, Pingdu City, Qingdao, involving structural components with single-unit lengths of approximately 27.2 meters. It encompasses the fabrication of high-complexity elements such as 26-ton double-shoulder components, four-corbel assemblies, and ultra-tall lattice columns with aircraft nose-inspired configurations. Key processes and techniques employed include rust removal for extra-wide plates (road/bridge panel shot blasting) and intricate edges (laser cleaning), oversized material cutting, medium-thick plate splicing, manual assembly welding for super-sized components, heavy lifting and positioning, vertical and overhead welding operations, as well as precision testing and measurement throughout the construction phase.

NEW BUILDING MATERIALS INDUSTRIAL PARK
The project is located in Tonghe Subdistrict, Pingdu City, Qingdao, Shandong Province. With a planned construction area of 48,000 square meters, the main steel structure weighs approximately 2,000 metric tons, and the primary framework adopts a portal frame structure.
![]() | ![]() | ![]() |
FAQ
Q: Are you a manufacture factory or trading company?
A: We are manufacture factory, you are always welcomed to visit us for inspection. The quality controlled flow will show you our professionalism, you will enjoy the best quality and competitive price.
Q: Whats the quality assurance you provided and how do you control quality ?
A: We establish a procedure to check products at all stages of the manufacturing process - from raw materials, in process materials, validated or tested materials, finished goods, etc. SGS, BV and other testing are available for us.
Q: Can you offer designing service?
A: Yes, we have excellent design team more than 80 engineers, we could design full solution drawings according to your requirments.
Q: What can you do when there is problem to install?
A: Usually we will send you the detailed installation drawing and video, we can provide the installation service, supervision and training by extra. We can send our professional technical engineer to supervise installation on site overseas. We also have professional construction team, they will help you to install the steel structure building if you need.