| Availability: | |
|---|---|
| Quantity: | |
Core Product Positioning
Tailored for international/regional/feeder airports
Solves pain points of traditional terminals: long construction cycles, difficult large-span space, high operation costs
Applicable to annual passenger throughput of 500,000–10 million
Covers full functions: check-in, security inspection, waiting, transfer
![]() | ![]() |
Technical Parameters
Parameter Category | Standard Specifications | Customization Scope |
Applicable Airport Throughput | Annual passenger volume: 500,000–10 million | Feeder airports (00) – International hubs (>10 million) |
Main Steel Material | Q355B / Q460 high-strength steel | Q235B–Q690 (adjusted by load-bearing demands) |
Single-Span Width | 30–60m (column-free design) | 15–80m (special engineering for ultra-large spans) |
Building Floors | 1–3 floors (with underground equipment layer) | 1–5 floors (based on site space & functional needs) |
Prefabrication Rate | ≥85% (core structural components) | 70%–95% (flexible per on-site construction conditions) |
Anti-Corrosion Duration | ≥20 years (double-layer protection) | ≥25 years (upgraded anti-corrosion coating) |
Seismic Resistance Level | ≥Grade 8 (seismic design code compliant) | Grade 8–9 (adjusted by regional seismic intensity) |
Wind Resistance Level | ≥Grade 12 (wind load standard compliant) | Customized by regional wind load requirements (e.g., typhoon-prone areas) |
Customer Cases

Jiaodong International Airport (Comprehensive Transportation Center and Parking Building) project adopts open-cut construction method. The buried depth of the structure is about 2.5m, the wrapping surface of the wall is about 3.5m*0.85m. Each steel tube column is made of 25mm or 16mm thick steel plate coil. And it is 30 meters high and weighs about 20 tons. It is transported to the construction site in sections of 17m+13m. The total amount of steel used in the project is about 1,500 tons.
FAQ
Q: Are you a manufacture factory or trading company?
A: We are manufacture factory, you are always welcomed to visit us for inspection. The quality controlled flow will show you our professionalism, you will enjoy the best quality and competitive price.
Q: Whats the quality assurance you provided and how do you control quality ?
A: We establish a procedure to check products at all stages of the manufacturing process - from raw materials, in process materials, validated or tested materials, finished goods, etc. SGS, BV and other testing are available for us.
Q: Can you offer designing service?
A: Yes, we have excellent design team more than 80 engineers, we could design full solution drawings according to your requirments.
Q: What can you do when there is problem to install?
A: Usually we will send you the detailed installation drawing and video, we can provide the installation service, supervision and training by extra. We can send our professional technical engineer to supervise installation on site overseas. We also have professional construction team, they will help you to install the steel structure building if you need.